Custom Simple Gas Stove Grate Pan Support

Product Details
Customization: Available
Type: Pan Support
Fuel Type: Without
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Experienced Team
The supplier has 7 foreign trading staff(s) and 4 staff(s) with over 6 years of overseas trading experience
Fast Delivery
The supplier can deliver the goods within 30 days
QA/QC Inspectors
The supplier has 3 QA and QC inspection staff
to see all verified strength labels (19)
  • Custom Simple Gas Stove Grate Pan Support
  • Custom Simple Gas Stove Grate Pan Support
  • Custom Simple Gas Stove Grate Pan Support
  • Custom Simple Gas Stove Grate Pan Support
  • Custom Simple Gas Stove Grate Pan Support
  • Custom Simple Gas Stove Grate Pan Support
Find Similar Products

Basic Info.

Model NO.
CAST IRON PAN SUPPORT
Number of Burner
2/4/5
Panel Material
Without
Ignition Mode
Without
Materials
Cast Iron Pan Support
Certification
CB, CE, RoHS, Saso, UL, UR
Place of Origin
Guangdong China (Mainland)
Brand Name
OEM/ODM
Function
Spare Parts
SKD/CKD
Aviailable
Transport Package
1 Pallet
Specification
CE
Trademark
HZT/OEM
Origin
Guangdong China (Mainland)
HS Code
7321900000
Production Capacity
30000/Month

Product Description

Product Type Cast Iron
Our Services Stamping,
Welded,
Hardware,
Plastic Injection,
Deep drawing,
CNC Machining,
Die Casting,
Silicone And Rubber,
Aluminum Extrusion,
Mould Making,etc
Process Methods CNC machining, Punching/Stamping Auto lathing/turning,Milling,Grindin, Tapping Drilling,Bending,Casting,Laser cutting
Drawing Format CAD,3D(stp,igs,dfx),PDF
Certificate CE
MOQ For stamping and injection molding: 1000pcs,based on drawing
Tolerance  In general:+-0.01-0.05 mm, can be more precision,according to your requirement.
Delivery time For stamping and injection molding,25 working days ,For machining,sample can be finished in 15-30 days,according to the drawing.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier